Quality Cleanrooms require an Experienced Team
to give a Quality Outcome.

When you purchase quality equipment and materials to build your Cleanroom, that is only part of the equation to success. You will want to know you are working with an experienced and knowledgeable team that can not only do the “Job” but provide insight and guidance along the way. We can provide a seamless hygienic finish, a “pure link” if you will, from floor to wall to ceiling. Below illustrates some of
what we provide.

  • Hygienic PVC Wall Installation Steps (Cladding)
  • Safety Flooring Installation
  • Cleanroom Door Installation Steps
  • Substrate Construction Steps

As a Certified PVC installer PURELINC Cleanrooms, takes great pride in our installation quality.

The process in providing you with a Premium Cleanroom:

  1. Layout the wall
  2. Install the corner
  3. Apply the adhesive
  4. Install the sheets
  5. Use Heat Weld process on the seams
  6. Seamless trim around doors, view panels, outlets, ceiling & HVAC units
  7. Floor to PVC areas get Cold Welded
  8. Clean thoroughly
Cleanroom Installation Barrie
PVC Panels Ontario
PVC Panels Ontario
  1. Prepare the existing concrete floor
  2. Cove the base
  3. Adhesive coat
  4. Installation of chosen safety flooring
PVC Wall Cladding Barrie
PVC Wall Cladding Barrie

Cleanroom Door & Trim Construction Process

  1. Install Cleanroom Door
  2. 45° edge overlap of the door frame with silicone sealant to PVC cladding  OR
  3. Butt up to the door frame with silicone sealant to PVC cladding
Cleanroom Construction Barrie

Wall Construction Process

  1. Install Steel studs
  2. Install Drywall
  3. Apply and bevel tape,
  4. Apply mud, sand, prep for PVC
Cleanroom Construction Barrie

Ceiling Construction Process

  1. Pinning, hang & wire
  2. Install Channeling
  3. Attach Drywall
  4. Apply & bevel tape
  5. Apply mud, sand, prep for PVC
Top